Building Permit

Back to Permit Info

 

General Information

A building permit is required for any new construction, alterations, additions, demolitions, accessory buildings, swimming pools, and/or other types of construction, which will improve or upgrade any property in the City of Harrisonburg.

 

The City of Harrisonburg enforces the 2006 Virginia Uniform Statewide Building Code along with the 2006 family of the International Codes. 

 

Design Criteria

Wind speed is 90 miles per hour, frost depth is 30 inches, seismic category is B, and the roof live load is 30 pounds per square foot with no reduction.

 

Seal Required

An architect's and/or engineer's seal is required on all drawings for assembly, educational, high hazard, institutional, hotel-motel and dormitory uses regardless of size. Other uses not listed above may require an architect's and/or engineer's seal depending on the square footage and/or height of the structure.

 

Information Required on Application

  1. The owner's complete name, present mailing address, and phone number.
  2. The contractor's complete name, present mailing address, phone number, copy of state class "A", "B", or "C" contractor's registration, and city business license number.
  3. The appropriate fee, based on total value- including labor and materials for building, plumbing electrical and mechanical work. Checks should be made payable to the City of Harrisonburg.

 

Accompanying Information

Site Plan submit one:

  1. A north indicator.
  2. The actual dimensions of the lot drawn to a scale of 1"=20' and drawn to the actual bearings of the lot.
  3. The actual location and dimensions of any existing structures on the lot.
  4. The actual location and dimensions of any structures being erected.
  5. The actual dimensional setbacks from the lot lines to the structure, including but not limited to: covered porches, decks, stairwells, etc.
  6. The actual square footage of the lot.
  7. All easements contained within the lot or which cross the lot at any location.
  8. All required off-street parking.

 

Building Plans (Submit two sets of the following, one set will remain on the record of the Building Inspection Office and the other will be stamped "approved" and returned to the owner or contractor and shall remain on the job site at all times during construction):

  1. A floor plan for each floor drawn to 1/4" scale.
  2. A typical wall or specific wall section drawn to scale.
  3. At least 2 elevations of the structure drawn to scale.
  4. All drawings shall show the overall dimensions of the structure, the internal dimensions of each room located within the structure, and the dimensional height of the structure.
  5. All rooms on the floor plans shall be labeled as to their use, i.e. bedroom, kitchen, etc.
  6. All bathrooms and kitchens shall show the location of all fixtures and appliances to be installed.
  7. All doors, windows, and stairways shall be sized on the drawings.

 

Supplemental Plans:

Supplemental plans may be required. Such supplemental plans would include, but not be limited to: Electrical, Plumbing, Mechanical, Fire Sprinkler Systems, and other supplemental plans as may be deemed necessary by the Building Inspection Office.

 

Application Processing

Once an application has been submitted, it is forwarded to the planning and engineering divisions for review for compliance with zoning requirements and any site plans issues. It is then returned to the building inspections division for final review, approval and issuance of the building permit.

 

Posting of Permit

The building permit shall be displayed on the outside of the building or premises where it is plainly visible from the street, and shall not be removed until the building or renovation is complete and ready for occupancy.

 

Inspection Information

Following is a list of required inspections:

  1. BUILDING: Footers, slab, foundation, framing, insulation, drywall, chimney, firewall, fire separation wall, final and others as necessary.
  2. PLUMBING: Under slab, rough-in, service lines, final and others as necessary
  3. ELECTRICAL: Under slab, rough-in, final and others as necessary
  4. MECHANICAL: Under slab, rough-in, gas lines, gas fireplaces or logs, final and others as necessary

ALL LISTED INSPECTIONS SHALL BE SCHEDULED BY THE CONTRACTOR, OWNER, OR OWNER'S AUTHORIZED AGENT.

 

Required Occupancy Certificate

Once the final building inspection has been completed and approved, a Certificate of Occupancy shall be issued prior to any occupancy.

 

Additional Notes

  1. In addition to the building permit, separate permits are required for electrical, plumbing, and mechanical work.
  2. For commercial work, a sign permit is required for the installation of any sign. (See procedure for obtaining a sign permit.)
  3. If desiring to do so, the owner may do the work as long as the proper permit has been obtained, all required inspections are called for, and an affidavit is signed by the owner.
  4. When submitting supplemental drawings for fire suppression systems, four (4) sets of drawings and four (4) sets of calculations are required.

Revised September 2008

 