South Main Street: Mosby Road to Stone Spring Road

  • Increase
  • Normal
  • Decrease

Current Size: 80%

The project will include adding a three-foot-wide concrete median on South Main Street from just south of Mosby Road to Stone Spring Road/Erickson Avenue. To reduce crashes and improve traveler safety along the corridor, the project will replace the current two-way left turn lane with dedicated left turn lanes for East Mosby Road, Dukes Plaza, and Erickson Avenue. Additionally, the project includes a 5-foot-wide sidewalk on the east side of the road and shelters at three bus stops to improve multimodal access on the corridor. Existing bike lanes will be removed to accommodate the median. The project was recommended by a VDOT STARS Study completed in 2020. VDOT STARS Study PDF[15MB] Project funded through the VDOT SMART SCALE program. 

Diagram of improvement

Public Hearing (Open-house style)

The City of Harrisonburg Public Works Department held a public hearing on February 22, 2024 from 4:00pm – 6:00pm at the Sentara RMH Wellness Center, 2500 Wellness Drive, Harrisonburg. 

Public Hearing Visual Aids

Corridor Crash Data Mosby to Stone Spring PDF[1,889KB]

Installation of Medians PDF[314KB]

Typical Section Graphic PDF[266KB]

Overall Graphic PDF[266KB]

Public Hearing Invitation Letter

English PDF[184KB]

Spanish PDF[129KB]

Arabic PDF[266KB]

Kurdish PDF[250KB]

Project Schedule:

Preliminary Engineering – 2022-23

Right-of-way acquisition and utility relocation – 2023-24

Construction – 2025