East Washington Street Bicycle Facilities and Parking Changes
East Washington Street is on the City’s 2017 paving schedule, and new pavement markings will be put down after repaving operations are completed.
East Washington Street is on the City’s 2017 paving schedule, and new pavement markings will be put down after repaving operations are completed.
Residents are invited to share ideas and learn more about the city’s trees. The meeting will be held in Massanutten Regional Library's Grand Room.
A Technical Assistance Grant to Incorporate Trees as Stormwater Management
The City of Harrisonburg and the Shenandoah Valley Soil and Water Conservation District will be hosting a Rain Barrel Workshop at the Westover Cecil F. Gilkerson Community Activities Center.
The Stormwater Advisory Committee and city staff are hosting an open-house meeting at the Community Activities Center where citizens are invited to learn about the ongoing development of the City’s Stormwater Improvement Plan.
Harrisonburg's Stormwater Improvement Plan (SWIP) is intended to be a long-range visionary plan that incorporates the City's stormwater needs to achieve regulatory compliance.
Open-house meeting at the Community Activities Center to share conceptual designs for the Garbers Church Road Shared Use Path.
The Friendly City Trail Shared-Use Path consists of sidewalk and shared-use path (SUP) improvements along Garbers Church Road, and between Garbers Church Road and Westover Park.
A Harrisonburg Bicycle and Pedestrian Plan Public Meeting will be hosted at Keister Elementary School cafeteria (100 Maryland Ave, Harrisonburg).
Per the City’s Subdivision and Zoning Ordinances and the City’s Design and Construction Standards Manual (DCSM), the City requires that a Traffic Impact Analysis be conducted for any planned development expected to generate 100 or more peak hour vehicle trips.