Last Updated: May 29, 2024
The project extends East Kaylor Park Drive to the site of Rocktown High School and connects to S. Main Street south of Pointe Drive. The project will install a signal at the South Main Street and East Kaylor Park intersection and create a right-in, right-out intersection at the new connection to South Main Street. A shared-use path will be constructed along the road through the high school site, with a sidewalk or shared-use path connections to South Main Street.
Project Schedule:
Preliminary Engineering – 2021-22
Right-of-way acquisition and utility relocation – 2021-22
Construction – 2023/24